| Foundation for female (front) and male
toilet
blocks. |
Two septic tanks under construction. |
|
Septic tanks complete with concrete caps. |
Completed toilet blocks. During rainy season, roof configuration channels rain through downspout to internal water reservoir behind toilet in photo to the right. In dry season, well water is used to wash
waste into septic system.
|